/
/
  1. Home
  2. /
  3. Movies
  4. /
  5. On the Critical Path
Affiche de On the Critical Path

On the Critical Path (1971)

★7.0/10 · 10h 22mDocumentary

Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.

Start a room for this movie

Where to watch

No streaming availability known for your region.

On Swipe Movie

Not enough data yet — be one of the first to swipe it.

Similar movies

  • Affiche de Uranium Drive-In
    Uranium Drive-In
    2013
  • Affiche de Nuclear Now
    Nuclear Now
    2023
  • Affiche de Radioactive: The Women of Three Mile Island
    Radioactive: The Women of Three Mile Island
    2024
  • Affiche de Sista varningen!
    Sista varningen!
    1980
  • Affiche de Wolsong: Vanishing Town
    Wolsong: Vanishing Town
    2019
  • Affiche de Inside Chernobyl with Ben Fogle
    Inside Chernobyl with Ben Fogle
    2021
  • Affiche de Decommissioning Fukushima 2024: Roadmap on the Brink
    Decommissioning Fukushima 2024: Roadmap on the Brink
    2024
  • Affiche de Seabrook 1977
    Seabrook 1977
    1978
  • Affiche de Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
    Elektro-Lähmung - Ein Film gegen die politische Ohnmacht
    1989
  • Affiche de The Atom: A Love Affair
    The Atom: A Love Affair
    2019
  • Affiche de The Battle of Chernobyl
    The Battle of Chernobyl
    2007
  • Affiche de Versprechen Kernfusion? - Der Wettlauf um die Energie der Zukunft
    Versprechen Kernfusion? - Der Wettlauf um die Energie der Zukunft
    2023